Change history for PAL - 7A (6B, 6C1)

Print

Date/time of ChangeAttributePrevious ValueUpdated Value
2021-07-30 11:05:16 Beamline Website https://sites.google.com/site/mxatpls2/beamlines https://pal.postech.ac.kr/paleng/bl/7A/
2013-08-02 05:44:31 Status Details Beamlines 6B and 6C1 have been decomissioned. As of the beginning of 2012 work done at 6B and 6C1 is being done at 7A.
2013-05-06 08:35:06 Beamline Website https://sites.google.com/site/mxatpls2/beamlines
2013-05-06 08:26:36 Spot Size (mm): Width 350 360
2013-05-06 08:26:30 Spot Size (mm): Height 100 120
2013-05-06 08:25:50 Mirrors Torroidal Mirror Rh coated Torroidal Mirror
2013-05-06 08:24:36 Detector: Model ADSC Quantum 270 ADSC Quantum Q270r
2013-05-06 08:20:26 Detector: Model ADSC Quantum 270 ADSC Quantum 270
2013-04-29 11:14:37 Primary Contact: Name Sung-Chul Ha Ha Sung-Chul