2013-04-30 08:24:59 |
Status Details |
Work done at this beamline is now done at 7A |
Work formerly done at this beamline is now done at 7A |
2013-04-30 08:23:00 |
Status Details |
|
Work done at this beamline is now done at 7A |
2013-04-30 07:57:00 |
Status |
operational |
Decommissioned |
2013-04-29 11:11:11 |
Owner/Operator |
PAL/PLS Pohang Accelerator Laboratory |
Pohang Accelerator Laboratory |
2013-04-29 11:11:06 |
Beamline Website |
http://paleng.postech.ac.kr/home/paleng/beamlines/xrayseries/6B |
|
2013-04-29 11:10:43 |
Secondary Contact: Email |
lhs@postech.ac.kr |
|
2013-04-29 11:10:38 |
Secondary Contact: Name |
Heung-Soo Lee |
|
2013-04-29 11:10:32 |
Primary Contact: Email |
ghkim@postech.ac.kr |
|
2013-04-29 11:10:27 |
Primary Contact: Name |
Ghyung Hwa Kim |
|
2011-05-09 04:08:20 |
Detector: Details |
end of 2008 |
Installed at the end of 2008 |
2011-05-09 04:07:19 |
Detector: Details |
|
installed spring 2002 - replaced at the end of 2008 |
2010-09-20 02:36:58 |
Beamline Website |
http://pal.postech.ac.kr/eng/beam/6b.php |
http://paleng.postech.ac.kr/home/paleng/beamlines/xrayseries/6B |
2009-08-12 11:59:11 |
Secondary Contact: Email |
ihs@postech.ac.kr |
lhs@postech.ac.kr |